Compute, cooled by the Arctic.

PUE · N-011.08
Hall load72%
Outside air−4 °C
UTC—
01CustomersWho trains in the North
Tensorfield
quorum
Vektor
Helix AI
Kernel
synapse
Orbit Labs
Photon

Training a frontier model now draws as much power as a small city. Up to forty percent of it goes to cooling, in places that are already too hot. We chose a place where the air does that work for free.

Learn more
+
022026 onwardsArctic capacityTwo sites, 180 MW by 2028
Fig. 01 — Cold aisle, N-01+
Cabled server racks in a data hall68.4385° N · Narvik, Norway
+
Site index

N-01 NarvikLive

Our first hall sits in a decommissioned mine above the Ofotfjord. Outside air below 10 °C for 300 days a year means no chillers, only fans. Waste heat warms the town's district network.

See site data
Capacity
60 MW IT
GPUs online
24,576 × H200
Interconnect
3.2 Tb/s InfiniBand
Grid
NO4 · 98.7% hydro
Latency to Oslo
9.4 ms
Certification
ISO 27001 · Tier III
+
Spot power price · NO4 · last 48 h · € / MWhNow €4.3Avg €14.5Peak €27.8
€0€10€20€30avg €14.5−48h−36h−24h−12hNow
Now · 16:00€4.3/ MWh-70% vs 48 h avg
03ComputeThree ways to run
+

Reserved clusters

Dedicated H200 and B300 pods from 256 GPUs, on one-to-three year terms.

From $1.62 / GPU-hr
Tensorfield training hall full of GPU racks

On-demand

Spin up 8 to 512 GPUs in minutes. Billed per second, no commitment.

From $2.24 / GPU-hr
Fibre network cables used by Helix

Sovereign tenancy

Private halls for governments and labs. EEA jurisdiction, your keys, your staff.

By arrangement
Satellite imagery used by Orbit for vision models
+
04Case studiesBuilt on cold compute
01 / 03
Overhead cable trays above server racksCase 01
Tensorfield2026 · Pre-training

A 70B foundation model, trained in 19 days on 4,096 H200s.

−34%Energy cost vs. previous region
Energy / run€1.42M €0.94M
Time to train24 d 19 d
Read case study
Network switch with fibre connectionsCase 02
Helix AI2026 · Inference

A protein-folding inference fleet moved north without a code change.

−61%CO₂ per million queries
CO₂ / M queries41 kg 16 kg
p50 latency38.0 ms 40.1 ms
Read case study
Silicon wafer with chip diesCase 03
Orbit Labs2025 · Vision

Petabyte-scale satellite vision, cooled by the fjord.

0 LWater used for cooling, per month
Water / month3.1 ML 0 L
Throughput0.8 PB 1.2 PB
Read case study
05DataMeasured at the meter
Annual PUE1.09

Average power usage effectiveness across 2025, metered hourly.

Renewable share98.7%

Hydro and wind from the NO4 grid, matched by the hour.

Water used0L

Free-air cooling. No evaporative towers, no chilled water loops.

Heat reused41GWh

Delivered to Narvik's district heating network last winter.

+
“We moved pre-training to Narvik in March. Same throughput, and our energy bill fell by a third.”
Amara Okafor, Head of Infrastructure, TensorfieldRecorded in Oslo · Mar 2026
+
07PricingPer H200 GPU-hour
Term
On-demand1 year3 years
Explore8 – 512 GPUs
$2.04/ GPU-hr

For research teams, fine-tunes and evaluation runs.

  • Per-second billing
  • Shared 400 Gb/s fabric
  • Checkpoint storage up to 2× model size
  • Email support, next business day
Start exploring
ScaleMost chosen
$1.84/ GPU-hr

Dedicated pods for production training, 256 to 16,384 GPUs.

  • Dedicated 3.2 Tb/s InfiniBand
  • Deadline guarantees with credits
  • Live PUE and carbon reports
  • Named engineer, 4-hour response
Reserve a pod
SovereignPrivate hall
Custom

Isolated halls under EEA jurisdiction for governments and labs.

  • Dedicated hall and power feed
  • Customer-held keys, on-site staff option
  • ISO 27001 · Tier III
  • 24/7 incident line
Talk to sales

Prices exclude VAT. B300 pricing on request. Power and cooling included.

+
08Plan capacityQ1 2027 allocation is open
Reply within one working day+

Build where it’s cold.

Cluster size · H200, 1-year term

For 1,024 GPUs: about $1.38M a month, 565 MWh of hydro power, and 134 t less CO₂ than an average EU site.

Thanks. An engineer replies within one working day.

Something went wrong. Please try again, or email hello@example.com.