The coldest place to train a model.

Scroll to open the horizonN 69.6492° · E 18.9553°
PUE · N-01 1.08Hall load 72%Outside air −4 °CNO4 spot €4.3 / MWhGPUs online 24,576Fabric 3.2 Tb/sWater used 0 LHeat reused 41 GWhUptime 99.995%PUE · N-01 1.08Hall load 72%Outside air −4 °CNO4 spot €4.3 / MWhGPUs online 24,576Fabric 3.2 Tb/sWater used 0 LHeat reused 41 GWhUptime 99.995%
01ProcessFrom signature to first job

Eleven days from contract to a cluster running your code. Every step is metered.

01

Reserve

Day 0

Tell us cluster size, GPU type and start date. You get a fixed quote with power, cooling and fabric included.

Quote in 1 dayFixed price
02

Rack

Day 3

Pods are allocated in Hall A and burned in for 72 hours before your first job touches them.

72 h burn-inH200 · B300
03

Train

Day 11

Jobs land on a dedicated 3.2 Tb/s fabric. Checkpoints stay in-hall, two milliseconds from your GPUs.

Slurm · K8sLive PUE
04

Report

Ongoing

Every hour of compute comes with metered energy, carbon and water figures you can hand to an auditor.

Hourly metersScope 2
02SitesEverything we run sits above the Arctic Circle
Scroll to travel north
Latitude66.20° NBelow the Arctic Circle—
66.5634° NThe line

Arctic Circle

North of this line the sun stays down for weeks each winter and the air stays below 10 °C for most of the year. That is our cooling system.

Days below 10 °C300+
Chillers needed0
GridHydro
N-02 · 67.8558° NConstruction

Kiruna

A 120 MW campus on the SE1 grid, built next to a hydro plant. First jobs land in Q3 2027.

Building shell38%
Capacity120 MW
Halls4
OpensQ3 2027
N-01 · 68.4385° NLive

Narvik

Our first hall, inside a former iron-ore mine above the Ofotfjord. Waste heat warms the town.

PUE now1.08
Hall load72%
GPUs24,576
HQ · 69.6492° NTromsø

Tromsø

Engineering and the 24/7 operations room. Every hall is watched from here, two hours' drive from the nearest rack.

Engineers34
Ops room24/7
Polar nightNov–Jan
03CustomersIn their words
“We moved pre-training to Narvik in March. Same throughput, and our energy bill fell by a third. The board noticed before we told them.”
Amara OkaforHead of Infrastructure · Tensorfield
04RatesPer GPU-hour, all-in
Power, cooling and fabric included
Hardware
On-demand
1-year term
3-year term
H200 SXM141 GB HBM3e
$2.24/hr
$1.84/hr
$1.62/hr
B300288 GB HBM3e
$2.98/hr
$2.61/hr
$2.34/hr
Sovereign hallPrivate · EEA
—
Custom
Custom

Prices in USD, excluding VAT. Volume pricing from 4,096 GPUs.

Allocation closes in —
Q1 2027 · 1,024 H200 left

Reserve your slice of the Arctic.

Q1 2027 allocation is open

Thanks. An engineer replies within one working day.

Something went wrong. Please try again, or email hello@example.com.